| Our To-Do-List |
| PROJECT | STARTED | COMPLETED |
| DONE Install DSL & offer free WiFi | 12/15/06 | |
| DONE Replace Beds | Deliver 10/14/06 | 10/22/06 |
| DONE Upgrade beds in Cabins 1 and 2 from Full to Queen | Deliver 10/14/06 | 10/22/06 |
| DONE 1 New Futon for each cabin | Deliver 10/14/06 | 10/22/06 |
| DONE New Motion Sensor Dimming Porch lights | 10/22/06 | |
| DONE New Bedding | Ordered 10/3/06 | 10/22/06 |
| DONE New Cooking Utensils and Pots & Pans | 10/22/06 | |
| DONE Live Remote Web Camera w/ Streaming Video | Ordered 10/24/06 | 11/04/06 |
| DONE New Roofs on Cabins 1 & 2 | Ordered 11/3/06 | 11/06/06 |
| DONE New Stoves and Refrigerators for each kitchen | Ordered 11/06/06 | 11/11/06 |
| DONE Trash Dumpster | Ordered 11/20/06 | 11/24/06 |
| DONE Remove old office and single-wide trailer | 11/30/06 | 12/5/06 |
| DONE New Dining Table & Chairs (Cabin 1 & 2) | 12/15/06 | |
| DONE Window Valances | 12/15/06 | |
| DONE Designated Camp Fire area #1 (upper park) | 12/27/06 | |
| DONE Designated Camp Fire area #2 (lower park) | 01/03/07 | |
| DONE Rock Walk Ways from parking to (Cabins 4 and 5) | 01/03/07 | |
| DONE Windows Blinds for kitchens in (Cabins 3-4 and 5-6) | 01/04/07 | |
| DONE Digital Thermostats for all cabins and Motel Rooms | 01/04/07 | |
| DONE TV's with DVD Players in Cabins 1 thru 6 | 02/03/07 | |
| DONE All New Window Blinds in Cabins 1 thru 6 | 02/03/07 | |
| DONE Medicine Cabinets and Additional Shelf in (Cabins 1 & 2) | 02/03/07 | |
| DONE Oak Bath Fixtures, towel racks... (Cabins 1,2,3,5,&6) | 02/03/07 | |
| DONE New Window Blinds in (Cabins 1 & 6) | 02/10/07 | |
| DONE New Shower Unit in Cabin 5 | 02/24/07 | 02/25/07 |
| DONE Replace Broken Windows in Cabins 1 & 2 | 02/17/07 | 02/17/07 |
| DONE Remodel Kitchen/Dining Area in Cabin 3-4 | 03/14/07 | 03/14/07 |
| DONE Removed abandoned Granada | 03/31/07 | 03/31/07 |
| DONE Removed old ice box and pile of pipe and antenna's | 04/01/07 | 04/01/07 |
| DONE Remodel Bath House for RV'ers | 03/31/07 | 07/13/07 |
| DONE New Carpet in All Cabins | 04/02/07 | |
| DONE Make #6 Wheelchair Accessible | 08/16/07 | |
| DONE Remodel Motel #7 | 08/06/07 | 08/10/08 |
| DONE Flower beds around Home/Office for my wife | 03/06/08 | 05/01/08 |
| DONE Flattened out RV K and made it longer | 10/15/07 | 10/16/07 |
| DONE Installed water tank to catch rain water | 07/06/08 | 07/06/08 |
| DONE Futon/Bunk Bed in Motel #9 | 08/01/08 | 08/05/08 |
| DONE New Sheets, that fit, on on all Queen Beds | 08/06/08 | 08/10/08 |
| DONE Solar powered LED Flood lights for main sign | 08/06/08 | 08/06/08 |
| DONE Burned brush pile at top of property | 08/15/2008 | 08/18/2008 |
|
DONE
We out-grew the power service we had one 200 amp meter feeding the
entire place!!! The Co-op is installing (3) 200 amp services,
and a Transformer to meet the demand.
Note; the park has survived on 200 amp since the 70's. Within 1.5 years of us buying the place, not to mention the work I have done, the demand was just too great!! (I just hope I have more problems like this.) |
08/01/2008 | 10/09/2008 |
| Paint Cabin Trim | ||
| DONE New Queen Size Pillows on all Queen Beds | 08/14/08 | 08/14/08 |
| DONE Repaired Culvert at entrance | 08/18/08 | 08/18/08 |
| DONE Hired Professional Cleaning Crew | 08/01/08 | |
| DONE Pruned Tree blocking some of the view from Pavilion | 09/20/08 | 09/20/08 |
| DONE Installed small light for the stoves in #1 and #2 | 09/25/08 | |
| DONE Removed gravel that built up at the entrance to improve traction. | 11/6/08 | |
| DONE Repaired the edge of the entrance that washed out | 11/6/08 | |
| DONE Now offering DVD Rentals | 11/11/08 | |
| Applied for Solar Power, but have 2 yr wait list | 11/13/07 | 11/01/09 |
| DONE Stripping then Painting white trim on Cabins 3, 4, 5, and 6, going with a forest green. | 05/13/09 | 05/15/09 |
| DONE Install 3,000 gal water tank and filters. | 07/14/09 | |
| DONE New gravel in RV L. | 07/14/09 | |
| ***JUST ENTERED or 1,000th reservation*** | 08/07/09 | |
| DONE New Door Bell (phone) that will call me no matter where I am. | 08/07/09 | |
| DONE Microwaves in all of the cabin kitchens. | 09/22/09 | |
| DONE New Porch Swing near Pavilion | 04/20/10 | 4/25/10 |
| DONE New Front Loader Washing machine in Laundry Room | 04/22/10 | |
| DONE Cable Channels in all Cabins and Motel rooms | 05/19/10 | 05/25/10 |
| Electric Meters on RV Spots | 05/01/10 | |
| Lay down Rail Road Ties to widen and flatten RV Spaces | 06/28/10 | |
| DONE Order new bedding for all the Full Size beds | 08/29/10 | 09/09/10 |
| DONE Order addition fleece blankets for all beds | 08/29/10 | 09/09/10 |
| DONE Replace missing items from units with kitchens | 08/29/10 | 09/09/10 |
|
Miscellaneous trivia; So far we have filled (3) 30 Yard Construction Dumpsters with "Stuff", for a total weight of 9.6 tons. (That doesn't include the old beds or old appliances that we gave away to charity.) We have also hauled away 3 dead refrigerators , 15 car batteries, (2) cars, Commercial Ice Box, and (2) 55 gallon drums filled with used motor oil and vegetable oil. (don't worry, it was all disposed of properly) |
||