Our To-Do-List |
PROJECT | STARTED | COMPLETED |
DONE Carbon Monoxide/Smoke Detectors | 10/15/06 | |
DONE Install DSL & offer free WiFi | 12/15/06 | |
DONE Replace Beds | Deliver 10/14/06 | 10/22/06 |
DONE Upgrade beds in Cabins 1 and 2 from Full to Queen | Deliver 10/14/06 | 10/22/06 |
DONE 1 New Futon for each cabin | Deliver 10/14/06 | 10/22/06 |
DONE New Motion Sensor Dimming Porch lights | 10/22/06 | |
DONE New Bedding | Ordered 10/3/06 | 10/22/06 |
DONE New Cooking Utensils and Pots & Pans | 10/22/06 | |
DONE Live Remote Web Camera w/ Streaming Video | Ordered 10/24/06 | 11/04/06 |
DONE New Roofs on Cabins 1 & 2 | Ordered 11/3/06 | 11/06/06 |
DONE New Stoves and Refrigerators for each kitchen | Ordered 11/06/06 | 11/11/06 |
DONE Trash Dumpster | Ordered 11/20/06 | 11/24/06 |
DONE Remove old office and single-wide trailer | 11/30/06 | 12/5/06 |
DONE New Dining Table & Chairs (Cabin 1 & 2) | 12/15/06 | |
DONE Window Valances | 12/15/06 | |
DONE Designated Camp Fire area #1 (upper park) | 12/27/06 | |
DONE Designated Camp Fire area #2 (lower park) | 01/03/07 | |
DONE Rock Walk Ways from parking to (Cabins 4 and 5) | 01/03/07 | |
DONE Windows Blinds for kitchens in (Cabins 3-4 and 5-6) | 01/04/07 | |
DONE Digital Thermostats for all cabins and Motel Rooms | 01/04/07 | |
DONE TV's with DVD Players in Cabins 1 thru 6 | 02/03/07 | |
DONE All New Window Blinds in Cabins 1 thru 6 | 02/03/07 | |
DONE Medicine Cabinets and Additional Shelf in (Cabins 1 & 2) | 02/03/07 | |
DONE Oak Bath Fixtures, towel racks... (Cabins 1,2,3,5,&6) | 02/03/07 | |
DONE New Window Blinds in (Cabins 1 & 6) | 02/10/07 | |
DONE New Shower Unit in Cabin 5 | 02/24/07 | 02/25/07 |
DONE Replace Broken Windows in Cabins 1 & 2 | 02/17/07 | 02/17/07 |
DONE Remodel Kitchen/Dining Area in Cabin 3-4 | 03/14/07 | 03/14/07 |
DONE Removed abandoned Granada | 03/31/07 | 03/31/07 |
DONE Removed old ice box and pile of pipe and antenna's | 04/01/07 | 04/01/07 |
DONE Remodel Bath House for RV'ers | 03/31/07 | 07/13/07 |
DONE New Carpet in All Cabins | 04/02/07 | |
DONE Make #6 Wheelchair Accessible | 08/16/07 | |
DONE Remodel Motel #7 | 08/06/07 | 08/10/08 |
DONE Flower beds around Home/Office for my wife | 03/06/08 | 05/01/08 |
DONE Flattened out RV K and made it longer | 10/15/07 | 10/16/07 |
DONE Installed water tank to catch rain water | 07/06/08 | 07/06/08 |
DONE Futon/Bunk Bed in Motel #9 | 08/01/08 | 08/05/08 |
DONE New Sheets, that fit, on on all Queen Beds | 08/06/08 | 08/10/08 |
DONE Solar powered LED Flood lights for main sign | 08/06/08 | 08/06/08 |
DONE Burned brush pile at top of property | 08/15/2008 | 08/18/2008 |
DONE
We out-grew the power service we had one 200 amp meter feeding the
entire place!!! The Co-op is installing (3) 200 amp services,
and a Transformer to meet the demand.
Note; the park has survived on 200 amp since the 70's. Within 1.5 years of us buying the place, not to mention the work I have done, the demand was just too great!! (I just hope I have more problems like this.) |
08/01/2008 | 10/09/2008 |
Paint Cabin Trim | ||
DONE New Queen Size Pillows on all Queen Beds | 08/14/08 | 08/14/08 |
DONE Repaired Culvert at entrance | 08/18/08 | 08/18/08 |
DONE Hired Professional Cleaning Crew | 08/01/08 | |
DONE Pruned Tree blocking some of the view from Pavilion | 09/20/08 | 09/20/08 |
DONE Installed small light for the stoves in #1 and #2 | 09/25/08 | |
DONE Removed gravel that built up at the entrance to improve traction. | 11/6/08 | |
DONE Repaired the edge of the entrance that washed out | 11/6/08 | |
DONE Now offering DVD Rentals | 11/11/08 | |
Applied for Solar Power, but have 2 yr wait list | 11/13/07 | Didn't Happen :-( |
DONE Stripping then Painting white trim on Cabins 3, 4, 5, and 6, going with a forest green. | 05/13/09 | 05/15/09 |
DONE Install 3,000 gal water tank and filters. | 07/14/09 | |
DONE New gravel in RV L. | 07/14/09 | |
***JUST ENTERED or 1,000th reservation*** | 08/07/09 | |
DONE New Door Bell (phone) that will call me no matter where I am. | 08/07/09 | |
DONE Microwaves in all of the cabin kitchens. | 09/22/09 | |
DONE New Porch Swing near Pavilion | 04/20/10 | 4/25/10 |
DONE Back-up generator for Motel Rooms | 05/07/10 | |
DONE New Front Loader Washing machine in Laundry Room | 04/22/10 | |
DONE Dish Network in all Cabins and Motel rooms | 05/19/10 | 05/25/10 |
Electric Meters on RV Spots | 05/01/10 | |
DONE Back-up generator for Cabins 1 & 2 | 08/30/10 | |
DONE New bedding for all the Full Size beds | 08/29/10 | 09/09/10 |
DONE Additional fleece blankets for all beds and Futons | 08/29/10 | 09/09/10 |
DONE Replace missing items from units with kitchens | 08/29/10 | 09/09/10 |
DONE Painted Windows & Trim on Cabins 1 & 2 | 12/15/10 | 12/18/10 |
DONE Made the commode level in Cabin 6. (seem odd to list that, but did it.) :-) | 03/11/10 | |
DONE New shower floor in Cabin 6 | 03/10/11 | |
DONE New low flow commodes in Cabin 5 & 6 | 03/12/11 | |
DONE Installed Rail Road Ties for RV B, now about 3' wider | 09/25/10 | |
DONE Back-up generator for Cabins 3-4 & 5-6 | 03/18/11 | 03/25/11 |
DONE Back-up generators for ALL Cabins and the Motel Rooms. | 03/25/11 | |
DONE Replaced stairs on the Pavilion | 07/03/11 | |
DONE Installed Rail Road Ties for RV A, now about 3' wider | 07/10/11 | |
Painting entry porches, door trim, and doors | 12/12/11 | |
DONE Replaced flooring in Cabin 5 bathroom | 12/05/11 | 12/05/12 |
DONE Replaced stairs for Cabin 4 | 12/09/11 | 12/09/12 |
DONE Replaced stairs for Cabin 5 | 12/10/11 | 12/10/12 |
DONE Install range hoods with light & filter for the cabin kitchens. Now you can see what you're cooking. | 01/9/12 | 01/18/12 |
DONE Install Tankless Water Heater for Motel Rooms | 02/07/12 | 02/08/12 |
DONE Install chair height commodes in 3-4 & 5-6 | 04/23/12 | |
DONE Install large attic vents in 3-4 & 5-6 | 04/25/12 | |
DONE Install large attic vents in 1 & 2 | 06/25/12 | |
DONE All new Patio Tables and Chairs for Pavilion. Seating for 28 now, and looks great too! (previously, seating for 16) | 07/02/12 | |
DONE New bathroom linens | 07/15/12 | |
DONE Paint old rusty corrugated steel roofs on 3-4 & 5-6 | 07/25/12 | |
DONE Paint log siding on 3-4 & 5-6 (the roof looked so good) | 07/26/12 | |
DONE Paint log siding and trim on the Motel Room building | 10/15/12 | |
DONE New flooring in Cabin 1 bathroom | 12/15/13 | |
DONE Removed that ugly stucco building above the motel rooms, to bring in a small double wide for my Dad to live in. | 04/06/13 | 04/27/13 |
DONE New Shower in Motel #7 | 06/09/13 | |
DONE Air Conditioning unit in Motel #7 | 06/10/13 | |
DONE Air Conditioning unit in Motel #8 | 06/25/13 | |
DONE New Shower in Motel #8 | 07/05/13 | |
DONE Air Conditioning unit in Motel #9 | 07/15/13 | |
DONE Replaced Carbon Monoxide/Smoke Detectors (Manufacturers recommendation) | 11/22/13 | |
Install screen doors on cabins 3-6 and the motel rooms too | Before Summer '13 | Opps, falling behind schedule |
Paint Log Cabins 1 & 2 | Soon | |
DONE Installed Conventional Water Heater for the Motel Rooms. Tankless Water Heater was a FAIL. | 02/14 | |
DONE Went to Tennessee and adopted or daughter! | 03/11/14 | 05/05/14 |
DONE Remodel Cabin #1 Bathroom, ripped entire shower out | 09/06/14 | 09/19/14 |
DONE Remodel Cabin #2 Bathroom, ripped entire shower out | 09/22/14 | 10/02/14 |
DONE New Fireplace Hearths in Cabin #3 | 12/09/14 | 10/16/14 |
DONE New Fireplace Hearths in Cabin #6 | 12/09/14 | 10/16/14 |
DONE Flat screen LCD TV #3 | 12/09/14 | |
DONE Flat screen LCD TV #6 | 12/09/14 | |
DONE Double Sided Wall Heater in Cabin #1, to heat the bedroom too. | 01/27/15 | |
DONE Heavy Duty 6 Leg Bed Frames for Cabins 3 thru 6. | 03/18 | |
SOON New Pillows for all the Cabins & Motel Rooms | 3/21/15 | |
DONE New Maid Service, she is awesome! | 3/15 | 3/15 |
DONE Deck Railing and Banisters for the Pavilion Deck | 3/21/15 | |
DONE Double Sided Wall Heater in Cabin #2, to heat the bedroom too. | 12/21/15 | |
DONE Replacing shower floor and surround in Cabins 3 & 4, level the floor up, and install bead board on the sink and shower walls. | 03/15 | |
DONE Replacing shower floor and surround in Cabins 5 & 6, level the floor up, and install bead board on the sink and shower walls. | 04/15 | |
DONE Replaced steps and bad railing to the Motel Rooms and paint rails and posts | 05/16 | |
My Dad was Diagnosed with Bladder Cancer Early May 2017, and I was his Care Giver. Then he passed away July 2017. It was hard to get get anything done during that time, and many months after that. So I didn't ge7 much accomplished in 2017. | 05/03/2017 | 11/17/2017 |
DONE Added Cabin 11, 3 Bedroom, 2 Bath, and Sleep up to 10 | 12/17 | |
DONE New Horse Shoe Pits | 07/03/18 | |
DONE New 13'x13' flat Communal Fire Pit Area. | 07/16 | 07/11/18 |
Miscellaneous trivia; We filled (3) 30 Yard Construction Dumpsters with "Stuff", for a total weight of 9.6 tons in the first 12 months. (That doesn't include the old beds or old appliances that we gave away to charity.) We have also hauled away 4 dead refrigerators , 15 car batteries, (2) cars, Commercial Ice Box, and (2) 55 gallon drums filled with used motor oil and vegetable oil. (don't worry, it was all disposed of properly) |
||